Hi Ian
The Operational is the highest resolution result - and in theory the most likely.
The Control is a lower resolution ensemble with no starting point adjustments.
The twenty ensembles are the same lower resolution as the control with very small tweaks to defined starting parameters.
When there’s a big difference between the control and operational it’s likely the calc resolution is having an effect on the prediction.
Originally Posted by: nsrobins